A Clear Path from Consultation to Power.

Every Greevo project follows the same engineered 12-step process — transparent, predictable and built to remove guesswork at every stage.

Our Process

From consultation to continuous support.

A clear, 12-step engineered process designed to deliver the right system for your site, goals and budget.

✦ Our Process 12 Steps, One Partner
Initial
Consultation
01
Site
Assessment
02
System
Design
03
Proposal &
Contract
04
Permitting &
Approvals
05
Procurement
06
Installation
07
Grid
Connection
08
Testing &
Commissioning
09
Monitoring &
Maintenance
10
Client
Education
11
Customer
Support
12

From your first phone call to years of monitored performance, every Greevo project moves through the same 12 engineered stages — nothing skipped, nothing left to guesswork.

● Discovery — 01–04 ● Deployment — 05–09 ● Partnership — 10–12
Step by Step

What happens at each stage.

A closer look at all 12 steps of the Greevo process.

01

Initial Consultation

We start with a free consultation to understand your energy needs, budget and site type.

02

Site Assessment

Our engineers visit your site to assess roof or land condition, sun exposure and load requirements.

03

System Design

We design a custom solar system sized specifically for your consumption and site conditions.

04

Proposal & Contract

You receive a transparent proposal with pricing, timeline and warranty details.

05

Permitting & Approvals

We handle all net-metering and utility approvals with your distribution company on your behalf.

06

Procurement

We source certified panels, inverters and components from trusted manufacturers.

07

Installation

Our certified technicians install your system safely, with minimal disruption to your routine.

08

Grid Connection

We connect your system to the grid and configure net-metering for energy export.

09

Testing & Commissioning

Every system undergoes rigorous testing before it's switched on for full operation.

10

Monitoring & Maintenance

Your system is enrolled in 24/7 remote performance monitoring from day one.

11

Client Education

We walk you through your system, monitoring app and basic maintenance steps.

12

Customer Support

Ongoing support from our team for the full lifetime of your solar system.

FAQs

Questions about our process.

Answers to the most common questions we get about how we work.

How long does the entire process take?

Residential projects typically complete within 3-5 weeks from consultation to commissioning. Commercial and industrial projects can take 6-14 weeks depending on scale.

Do I need to be present during installation?

Not necessarily, but we recommend being available for the site assessment and final walkthrough so our team can address any questions directly.

Who handles the net-metering paperwork?

We do. Our team manages the full application and approval process with your local distribution company on your behalf.

What happens after installation?

Your system is enrolled in 24/7 remote monitoring, and our support team remains available for maintenance and any questions going forward.

Let's Go Solar

Ready to power your future with solar?

Talk to our team for a free site assessment and a custom solar solution built around your needs.