A Clear Path from Consultation to Power.
Every Greevo project follows the same engineered 12-step process — transparent, predictable and built to remove guesswork at every stage.
From consultation to continuous support.
A clear, 12-step engineered process designed to deliver the right system for your site, goals and budget.
Consultation
Assessment
Design
Contract
Approvals
Connection
Commissioning
Maintenance
Education
Support
From your first phone call to years of monitored performance, every Greevo project moves through the same 12 engineered stages — nothing skipped, nothing left to guesswork.
What happens at each stage.
A closer look at all 12 steps of the Greevo process.
Initial Consultation
We start with a free consultation to understand your energy needs, budget and site type.
Site Assessment
Our engineers visit your site to assess roof or land condition, sun exposure and load requirements.
System Design
We design a custom solar system sized specifically for your consumption and site conditions.
Proposal & Contract
You receive a transparent proposal with pricing, timeline and warranty details.
Permitting & Approvals
We handle all net-metering and utility approvals with your distribution company on your behalf.
Procurement
We source certified panels, inverters and components from trusted manufacturers.
Installation
Our certified technicians install your system safely, with minimal disruption to your routine.
Grid Connection
We connect your system to the grid and configure net-metering for energy export.
Testing & Commissioning
Every system undergoes rigorous testing before it's switched on for full operation.
Monitoring & Maintenance
Your system is enrolled in 24/7 remote performance monitoring from day one.
Client Education
We walk you through your system, monitoring app and basic maintenance steps.
Customer Support
Ongoing support from our team for the full lifetime of your solar system.
Questions about our process.
Answers to the most common questions we get about how we work.
How long does the entire process take?
Residential projects typically complete within 3-5 weeks from consultation to commissioning. Commercial and industrial projects can take 6-14 weeks depending on scale.
Do I need to be present during installation?
Not necessarily, but we recommend being available for the site assessment and final walkthrough so our team can address any questions directly.
Who handles the net-metering paperwork?
We do. Our team manages the full application and approval process with your local distribution company on your behalf.
What happens after installation?
Your system is enrolled in 24/7 remote monitoring, and our support team remains available for maintenance and any questions going forward.